What does a buyer check before shortlisting a machine supplier?

Plact Research

Answer

They check the output rate against their production requirement, the utilities and footprint against their plant, and whether spares and service reach their location. A machine page without a capacity figure cannot be shortlisted, however good the machine is.

A plant manager is drawing up a shortlist for a capex proposal and needs numbers he can put in a table.

Information to make clear

Use the fields that affect this buying decision. Leave unsupported claims out.

Model and machine family
The buyer needs something to name in an internal document.
Output rate or capacity
The number the whole purchase is justified against.
Materials or products handled
Determines whether the machine fits their process at all.
Footprint, weight and headroom
Plant layout kills more deals than price does.
Power and utility requirement
Compressed air, water, voltage and phase are commissioning blockers.
Automation and control level
Manual, semi-automatic and fully automatic are different products.
Options and configurable modules
Lets the buyer see how close the standard machine is to their requirement.

Documents to prepare

State what can be published, shared on request or issued with an order.

Documents relevant to industrial machinery, what each supports and suggested handling
DocumentWhat it supportsSuggested handling
Technical specification sheetMay be requested at: shortlistingCapacity, dimensions, utilities and options in a comparable formatPublish
General arrangement drawingMay be requested at: layout planning, before orderThat the machine fits the intended spaceShare on request
EC Declaration of ConformityMay be requested at: by eu buyers, before shipmentConformity with the applicable European directives: this is the document; CE is the markingPublish
Electrical safety compliance (IEC 60204-1)May be requested at: technical reviewThat the control panel meets machine electrical safety requirementsShare on request
Factory Acceptance Test protocolMay be requested at: contract negotiationWhat will be demonstrated before the machine leaves your floorPublish
Spare parts list and manualMay be requested at: total cost evaluationThat the machine can be maintained over its lifeShare on request
Installation reference listMay be requested at: risk assessmentThat machines of this model are running in production somewherePublish

Details to ask in an enquiry

Collect only the information needed to assess the request and respond.

Application and material
Decides which machine family applies.
Required output rate
Decides the model and the price band.
Available space and utilities
Prevents quoting a machine that cannot be installed.
Automation level wanted
Materially changes the configuration.
Installation location
Drives freight, commissioning and service planning.
Target commissioning date
Tells you whether this is budgeting or buying.

Related questions

Should we publish prices for machines?

A price band with the conditions attached usually helps more than it costs. Buyers building a capex case need an order of magnitude, and the ones who leave because the band is too high were never going to buy. If configuration makes a band meaningless, publish the basis instead: what drives the price up and down.

How much of the specification should be public versus gated?

Capacity, footprint, utilities and materials handled should be public: they are the shortlisting fields. Detailed drawings, control architecture and commercial terms are reasonable to share after contact. Gating the shortlisting fields removes you from the shortlist.

Do installation references need to name the customer?

No. Industry, country, model and year is usually enough for a buyer to judge relevance, and it avoids the permission problem entirely. A named reference is stronger, but only with written permission on file: an unapproved logo is a real commercial risk.

This is an editorial checklist, not a compliance standard. Requirements vary by market, customer and contract. Confirm current requirements with the responsible technical and commercial teams.

Plact Research. Plact's editorial desk for buyer-evidence guides. The guides organize common buyer questions, documents and enquiry fields. Requirements should be checked against current standards, regulations and contracts.