Answer
They check free air delivery at the working pressure they actually need, the specific power the machine draws to produce it, and the air quality class after treatment. Electricity is most of the lifetime cost of a compressor, so specific power decides the purchase more often than the capital price.
A plant engineer is comparing two machines with similar prices and very different electricity bills.
Information to make clear
Use the fields that affect this buying decision. Leave unsupported claims out.
- Free air delivery at stated pressure
- Capacity claimed without its pressure is not comparable.
- Working and maximum pressure
- Determines suitability for the application.
- Specific power
- Energy per unit of air, which dominates lifetime cost.
- Compressor type
- Reciprocating, screw, scroll and centrifugal suit different duty cycles and pressures.
- Lubricated or oil-free
- A hard requirement in food, pharmaceutical and electronics work.
- Air quality class after treatment
- The specification the process actually needs.
- Noise level and cooling requirement
- Decide where the machine can be installed.
Documents to prepare
State what can be published, shared on request or issued with an order.
| Document | What it supports | Suggested handling |
|---|---|---|
| Performance datasheetMay be requested at: shortlisting | Free air delivery, pressure, specific power and noise under a stated test standard | Publish |
| Test certificate for the specific machineMay be requested at: acceptance | Measured performance for the unit shipped, not the model | Issue per shipment |
| Air quality class certificationMay be requested at: oil-free and regulated applications | Purity class achieved for oil, water and particulates | Publish |
| Declaration of ConformityMay be requested at: before shipment to regulated markets | Conformity with pressure equipment and machinery requirements | Publish |
| Energy cost comparison basisMay be requested at: capital case | How lifetime running cost is calculated and on what assumptions | Publish |
| Service schedule and parts listMay be requested at: total cost evaluation | What is serviced, how often and at what cost | Publish |
| Warranty and service coverageMay be requested at: purchase decision | Period, exclusions and engineer coverage | Publish |
Details to ask in an enquiry
Collect only the information needed to assess the request and respond.
- Air demand and working pressure
- The basis of every selection.
- Duty cycle and shift pattern
- Determines the machine type and size.
- Air quality requirement
- Decides treatment and whether oil-free is needed.
- Existing installation
- What is being replaced and why.
- Site constraints
- Space, ventilation, noise limits and power supply.
- Electricity tariff
- Lets you make the lifetime cost case honestly.
Related questions
Should we publish an energy cost comparison?
Yes, with the assumptions shown: hours of operation, electricity price, pressure and load profile. Buyers know energy dominates the cost of compressed air and are looking for someone to lay it out honestly. A comparison with its assumptions visible is persuasive; one without them is dismissed.
How should air quality classes be presented?
By naming the class for oil, water and particulates for each machine and treatment combination. Food, pharmaceutical and electronics buyers specify to a class, and a supplier who writes "clean, dry air" instead cannot be specified into those plants.
What matters most in a replacement purchase?
Why the last machine disappointed. Usually it is energy cost, unplanned downtime or air quality problems. Structuring your pages around those three failures, with real figures, reaches a buyer at the moment they are actually deciding.
This is an editorial checklist, not a compliance standard. Requirements vary by market, customer and contract. Confirm current requirements with the responsible technical and commercial teams.
Plact Research. Plact's editorial desk for buyer-evidence guides. The guides organize common buyer questions, documents and enquiry fields. Requirements should be checked against current standards, regulations and contracts.