What does a buyer check before ordering a crane or hoist?

They check safe working load and span against the building, the duty classification against how hard the crane will work, and the test and inspection certification. Duty class is what separates a crane that lasts from one that fails early, and it is routinely left out.

A works engineer is specifying lifting equipment that will be inspected regularly and must not be the reason for a stoppage.

Reviewed 4 August 2026

Plact Research

Scope and specifications

Safe working load
The headline specification, and a legal one.
Span and lift height
Must match the building structure.
Duty classification
How intensively the crane can be worked over its life.
Crane type
Overhead, gantry, jib and monorail suit different layouts.
Travel speeds and control type
Determine cycle time and operator experience.
Power supply and control voltage
Installation constraint.
Wheel loads and end carriage details
The structural engineer needs these before anything else.

Documents buyers may need

Documents buyers ask a crane and hoist manufacturer for, what each proves, and whether it belongs on the public site
Load test certificateAsked at: before first use — legally required in most marketsProof load test performed before handoverPer shipment
Design calculation and duty classificationAsked at: design approvalThat the crane is designed for the intended dutyName it, share on request
Declaration of ConformityAsked at: before commissioningConformity with machinery and lifting requirementsPublish it
Wheel load and structural dataAsked at: building design stageLoads imposed on the building structurePublish it
Inspection and maintenance scheduleAsked at: handoverStatutory inspection intervals and what they coverPublish it
Operator and maintenance manualAsked at: handoverSafe operation and maintenance proceduresPublish it
Spare parts availability statementAsked at: total cost evaluationHow long parts remain available for the modelPublish it

Details for a useful enquiry

Load to be lifted and lift height
The core specification.
Span and building details
Determines feasibility and structural impact.
Duty and cycles per hour
Sets the classification required.
Application and environment
Hot, corrosive or hazardous areas change the design.
Existing structure or new build
Decides whether the building can take the loads.
Installation window
Crane installation usually requires a shutdown.

Questions suppliers ask

Why does duty classification matter so much?

Because two cranes with the same safe working load can be designed for very different working lives. A crane classified for light intermittent use will fail early in a foundry. Publishing the classification protects you from the failures and lets serious buyers see the difference from a cheaper offer.

Should wheel loads be published before an order?

Yes, for standard configurations. The structural engineer needs them early and the project cannot progress without them. Being the supplier whose data is already available is often enough to be designed in before a competitor is even contacted.

How should service and inspection be presented?

As an ongoing obligation you support, with intervals and scope stated. Buyers of lifting equipment carry legal duties around inspection, and a manufacturer who explains those duties and offers to meet them is providing something the price comparison does not capture.

Check which documents and standards your buyer needs; requirements vary by market, customer and contract.

Plact Research. Plact's editorial desk for buyer-evidence research. Industry standards, documents and buyer questions are researched and drafted with Plact's AI tools, then reviewed by Praveen Kavuri before publication. Every claim cites the standard, regulation or public source it rests on.

Related buyer questions

Put this to work on your website

See how Plact helps buyers find what you offer and send a useful enquiry.