This is what a buyer checks before they shortlist a electrical and electronics supplier.

What does a buyer check before sending you Gerbers or a bill of materials?

They check your capability limits against the board — layer count, minimum track and gap, hole size, finish — and the IPC class you build to. A capability matrix with real minimums and maximums answers the whole first conversation and prevents quotes you would have to withdraw.

A hardware engineer has a design ready and is deciding which two or three suppliers get the files.

Reviewed 4 August 2026 · Written for electronics manufacturing services providers selling to business buyers

Buyer asks

What does a buyer check before sending you Gerbers or a bill of materials?

Illustrative. The question is real; it is the one this guide answers.
WHAT THEY NEED TO BELIEVEWHAT SETTLES ITWHEN THEY ASKYour real minimums and max…Capability matrixBefore files are sentWhich acceptance class you…IPC class statementTechnical qualificationQuality system, and IATF 1…ISO 9001 plus sector certif…Vendor approval
Every claim on a supplier site has a document behind it or it does not. Buyers in electronics and ems know which is which.

What a buyer needs to identify the product

These are the fields a buyer scans before deciding whether you are worth contacting. Missing one of them usually ends the visit without an email.

  1. 1

    Layer count range

    The first filter on any board.

  2. 2

    Minimum track and gap

    Decides whether the design is manufacturable at your shop.

  3. 3

    Minimum hole size and aspect ratio

    Common cause of a design being bounced back.

  4. 4

    Base material and Tg range

    FR-4 grades, high-frequency and metal-core are different capabilities.

  5. 5

    Surface finish options

    HASL, ENIG, OSP and immersion finishes affect assembly and shelf life.

  6. 6

    Maximum panel and board size

    A hard constraint that is cheap to publish.

  7. 7

    Assembly capability and volume band

    SMT, through-hole, mixed and volume range shape the quote.

The documents buyers ask for

Not all of them belong on a public page. Naming the ones you can issue is what separates a supplier who can be audited from one who cannot.

Documents buyers ask a electronics manufacturing services provider for, what each proves, and whether it belongs on the public site
DocumentWhat it provesWhere it belongs
Capability matrixAsked at: before files are sentYour real minimums and maximums, parameter by parameterPublish it
IPC class statementAsked at: technical qualificationWhich acceptance class you build and inspect toPublish it
ISO 9001 plus sector certificatesAsked at: vendor approvalQuality system, and IATF 16949, AS9100 or ISO 13485 where the sector demands itPublish it
UL certification and file numberAsked at: products entering north american marketsRecognised construction for the boardPublish it
Test and inspection capability listAsked at: technical qualificationAOI, in-circuit test, flying probe, X-ray and functional testPublish it
RoHS, REACH and conflict minerals declarationsAsked at: onboardingMaterial compliance for the destination marketPublish it
ESD control programmeAsked at: auditHandling controls against a recognised standardName it, share on request

Where electronics and ems sites lose the enquiry

Each of these is common, cheap to fix, and costs an enquiry that never arrives — so nobody ever reports it.

  • "Advanced capabilities" with no parameter table

    The engineer cannot check the design against your shop, so the files go to a supplier who published the numbers.

  • IPC referenced without a class

    Class 2 and Class 3 are materially different acceptance criteria and a different price. Omitting the class reads as building to neither.

  • No statement on NDA and file handling

    Hardware designs are the customer's core IP, and an engineer who cannot see how files are handled will not upload them.

What the enquiry form should ask

A form that collects these can be answered properly the first time. A form that collects a name and a message cannot.

Enquiry form — electronics and ems

Enough to reply usefully, short enough that a buyer finishes it.

Gerber or ODB++ files
Nothing can be quoted precisely without them.
Layer count, size and quantity
The core price drivers.
Material and surface finish
Changes cost and lead time significantly.
IPC class required
Determines inspection and yield assumptions.
Assembly scope
Bare board, assembly, or box build are different quotes.
Destination and target date
Compliance requirements and freight follow the destination.

Questions suppliers ask

How detailed should a capability matrix be?

Detailed enough that an engineer can check their design against it without contacting you: layer count, minimum track and gap, minimum hole, aspect ratio, maximum panel, materials, finishes and tolerances. It is the single highest-value page an EMS supplier can publish.

Should we publish our equipment list?

Yes — makes, models and counts for placement, reflow, AOI and test. Buyers use it to judge throughput and quality capability, and unlike a photograph it can be evaluated against their own volume requirement.

What should we say about IP and file confidentiality?

State plainly how files are received, who can access them, whether an NDA is signed before or after files arrive, and what happens to files after the project. This is often the deciding factor for a first-time customer and it is entirely within your control to answer.

Documents and standards named here are the ones buyers in this industry commonly ask for; requirements vary by market, customer and contract, so treat this as a starting checklist rather than a compliance list. Clearer pages can help discovery and evaluation. They do not guarantee rankings, AI citations, enquiries or revenue.

Illustrative

An enquiry from this search looks like: Material and surface finish · Layer count, size and quantity · Destination and target date · Gerber or ODB++ files

Related buyer questions