What does a manufacturer check before committing to an automation project?

They check payload and reach against the part, cycle time against the required rate, and exactly where your responsibility ends. Most automation projects fail at integration rather than at the robot, so a clear scope boundary matters more than the specification.

A production manager has been burned by an automation project that worked in a demonstration and not on their floor.

Reviewed 4 August 2026

Plact Research

Scope and specifications

Application and process automated
The category the buyer is shopping in.
Payload and reach
The hard filter against the part and the cell.
Cycle time achievable
Determines whether the business case works.
Repeatability
Governs whether the process holds tolerance.
Integration scope
What you deliver and where the customer's responsibility starts.
Safety concept
Fenced, collaborative or hybrid changes the layout and the cost.
Programming and support model
Who changes the program when the product changes.

Documents buyers may need

Documents buyers ask a robotics and automation supplier for, what each proves, and whether it belongs on the public site
Technical specificationAsked at: shortlistingPayload, reach, repeatability, speed and footprintPublish it
Cycle time studyAsked at: before commitment — where projects failThat the required rate is achievable with the actual partName it, share on request
Scope of supply documentAsked at: contract stagePrecisely what is included and what is notPublish it
Risk assessment and safety conceptAsked at: design and commissioningHow the cell is made safe and to what standardPublish it
Declaration of ConformityAsked at: before commissioningConformity for the completed machine or cellPublish it
Factory Acceptance Test protocolAsked at: contract stageWhat is proved before the cell shipsPublish it
Training and support termsAsked at: handoverWho can reprogram the cell and what support is availablePublish it

Details for a useful enquiry

Process to be automated
The starting point.
Part details and variation
Variation is what defeats automation.
Required cycle time and volume
The basis of the business case.
Existing equipment to integrate with
Where most of the risk sits.
Available floor space and services
Constrains the cell design.
Internal capability for support
Decides the support model needed.

Questions suppliers ask

What makes an automation supplier trustworthy on a first project?

Precision about scope. Publishing a clear statement of what you deliver, what the customer provides, and where responsibility transfers is more reassuring than any case study. Buyers have usually experienced a project that failed in exactly that gap.

Should cycle times be published?

Publish typical cycle times with the application and part described, and offer a study on the customer's actual part. Automation is bought on rate, and a supplier who commits to measuring it before the order is trusted far more than one quoting a demonstration figure.

How should collaborative robots be presented?

Honestly about where they fit. They remove fencing in some applications and are slower in others, and the safety assessment still has to be done for the whole application. Buyers who have been oversold on them are wary, and plain treatment of the trade-offs stands out.

Check which documents and standards your buyer needs; requirements vary by market, customer and contract.

Plact Research. Plact's editorial desk for buyer-evidence research. Industry standards, documents and buyer questions are researched and drafted with Plact's AI tools, then reviewed by Praveen Kavuri before publication. Every claim cites the standard, regulation or public source it rests on.

Related buyer questions

Put this to work on your website

See how Plact helps buyers find what you offer and send a useful enquiry.