This is what a buyer checks before they shortlist metals and metalworking suppliers.

What does a buyer check before sending you a drawing or an RFQ?

They check that the standard, material grade and property class you work to match their drawing, and that you can issue the test certificate their inspection process needs. Naming the standard number and the certificate type you supply resolves both questions before they attach a file.

A design engineer has a drawing in hand and three supplier sites open, deciding which one to send it to first.

Last corpus review: 4 August 2026 · Written for industrial component manufacturers selling to business buyers

Plact Research
Buyer asks

What does a buyer check before sending you a drawing or an RFQ?

Illustrative. The question is real; it is the one this guide answers.

What buyers check in metals and metalworking

Three things, in order: what the product is, what the paperwork proves, and when each document gets asked for.

Chemistry and mechanical properties — type…

Material test certificate to EN 10204

Asked at: with shipment, and often specified on the purchase order

That the produced part matches the drawing

Dimensional inspection or First Article Inspection report

Asked at: first production run

Production part approval for automotive cus…

PPAP package

Asked at: automotive sourcing

Every claim on a supplier site has a document behind it or it does not. Buyers in industrial components know which is which.

First, what the product is

The fields a buyer scans before deciding whether you are worth contacting. Missing one of them usually ends the visit without an email.

  1. 1

    Standard and standard number

    "As per DIN" is not a specification; DIN 933 is.

  2. 2

    Material grade

    The buyer's drawing names a grade, and the match is binary.

  3. 3

    Property class or strength grade

    8.8, 10.9, A2-70 and A4-80 are the shorthand every buyer scans for.

  4. 4

    Size and thread range

    Tells the buyer in one line whether their part is inside your envelope.

  5. 5

    Finish and coating

    Plating, passivation and coating change corrosion performance and lead time.

  6. 6

    Tolerance class

    Decides whether your process can hold their drawing.

  7. 7

    Made-to-drawing capability

    A catalogue supplier and a job shop attract different enquiries.

Then the paperwork

Naming the documents you can issue is what separates a supplier who can be audited from one who cannot.

Documents buyers ask a industrial component manufacturer for, what each proves, and whether it belongs on the public site
Material test certificate to EN 10204Asked at: with shipment, and often specified on the purchase orderChemistry and mechanical properties — type 3.1 is issued by your own inspection function, type 3.2 is countersigned by an independent inspectorPer shipment
Dimensional inspection or First Article Inspection reportAsked at: first production runThat the produced part matches the drawingPer shipment
PPAP packageAsked at: automotive sourcingProduction part approval for automotive customers, at a stated submission levelName it, share on request
ISO 9001 or IATF 16949 certificateAsked at: vendor approvalQuality system, with certificate number and certification bodyPublish it
Salt spray test report (ASTM B117)Asked at: when the application is outdoor or marineCorrosion performance of the coating you quoteName it, share on request
Hardness and tensile test reportsAsked at: technical evaluation and incoming inspectionMechanical conformance to the property classPer shipment
RoHS and REACH declarationAsked at: by eu and electronics buyersSubstance compliance for the destination marketPublish it

The shortlist moment

A buyer lines up a few suppliers and keeps the ones whose proof is easy to check. The rest get a closed tab, not an email.

The buyer asks: What does a buyer check before sending you a drawing or an RFQ?

A few suppliers get compared side by side:

A supplier with ISO 9001 or IATF 16949 certificate on the page

Quality system, with certificate number and certification body

A supplier with RoHS and REACH declaration on the page

Substance compliance for the destination market

A supplier with PPAP package ready to send

Production part approval for automotive customers, at a stated submission level

Is one of them you?

Illustrative. The documents are the ones buyers in this industry ask for.

What Plact does for metals and metalworking suppliers

Four jobs, done on your site. Each one is a document buyers in this industry already ask for.

  1. Put the ISO 9001 or IATF 16949 certificate on the page buyers check

    Quality system, with certificate number and certification body

  2. Put the RoHS and REACH declaration on the page buyers check

    Substance compliance for the destination market

  3. Name the PPAP package and share it on request

    Production part approval for automotive customers, at a stated submission level

  4. Name the Salt spray test report (ASTM B117) and share it on request

    Corrosion performance of the coating you quote

What a useful enquiry looks like

A form that collects these fields can be answered properly the first time. A form that collects a name and a message cannot.

Enquiry form · industrial components

Enough to reply usefully, short enough that a buyer finishes it.

Drawing or part reference
The single most useful thing on the form.
Standard and material grade
Determines whether you can quote.
Property class and finish
Changes both process route and price.
Quantity and call-off pattern
One-off, annual and scheduled volumes price very differently.
Certificate type required
3.1 and 3.2 have different costs and lead times.
Destination and required date
Freight and capacity planning.

An enquiry from this search asks for

  • Drawing or part reference
  • Quantity and call-off pattern
  • Destination and required date
  • Standard and material grade
Illustrative. A form that collects these can be answered the first time.

Questions suppliers ask

What is the practical difference between EN 10204 3.1 and 3.2?

A 3.1 certificate is validated by the manufacturer's own inspection representative, independent of the manufacturing department. A 3.2 certificate is additionally validated by the purchaser's representative or an independent inspector. Some purchase orders require 3.2 and cannot accept 3.1, which is why buyers look for the statement before enquiring.

Should we publish a capability matrix with our maximum sizes?

Yes. The most common reason an RFQ wastes both sides' time is that the part was outside the supplier's envelope all along. A size, tolerance and material matrix filters those out before the drawing is sent, and it signals a shop that knows its own limits.

Do we need to show the factory to win an RFQ?

Photographs of a shop floor help less than a machine list with makes, sizes and counts. Buyers are trying to work out whether you can hold the tolerance and the volume; a list answers that, a wide-angle photograph does not.

Documents and standards named here are the ones buyers in this industry commonly ask for; requirements vary by market, customer and contract, so treat this as a starting checklist rather than a compliance list. Clearer pages can help discovery and evaluation. They do not guarantee rankings, AI citations, enquiries or revenue.

Plact Research. Plact's editorial desk for buyer-evidence research. Industry standards, documents and buyer questions are researched and drafted with Plact's AI tools, then reviewed by Praveen Kavuri before publication. Every claim cites the standard, regulation or public source it rests on.

Related buyer questions

Get your free review

A free review of what a buyer finds when they look for metals and metalworking suppliers, and what to fix first.