Answer
They check the glass type and thickness against the structural and safety requirement, the safety classification where it is required by regulation, and the thermal and solar performance values. Safety classification is a legal requirement in defined locations, not a specification option.
A facade contractor is ordering glass that must satisfy both a thermal calculation and a safety regulation.
Information to make clear
Use the fields that affect this buying decision. Leave unsupported claims out.
- Glass type and processing
- Float, toughened, laminated and insulated units are different products.
- Thickness and configuration
- Determines structural capability and unit build-up.
- Safety classification
- Legally required in defined locations.
- Thermal transmittance value
- The number the building's energy calculation uses.
- Solar factor and light transmission
- Governs comfort and cooling load.
- Maximum pane size
- The processing constraint.
- Edgework and hole processing
- Determines what fabrication you can do in-house.
Documents to prepare
State what can be published, shared on request or issued with an order.
| Document | What it supports | Suggested handling |
|---|---|---|
| Product performance datasheetMay be requested at: specification and calculation | Thermal, solar and light values for the specified build-up | Publish |
| Safety glass certificationMay be requested at: regulated locations: mandatory | Conformity with the safety glazing standard | Publish |
| Toughening or lamination test evidenceMay be requested at: quality assurance | That the process meets the standard claimed | Share on request |
| Insulated glass unit durability certificationMay be requested at: facade projects | Durability testing of the sealed unit | Publish |
| Structural calculation supportMay be requested at: facade design | That the specified glass carries the design loads | Share on request |
| Dimensional tolerance specificationMay be requested at: fabrication planning | Manufacturing tolerances for the processed product | Publish |
| Warranty termsMay be requested at: purchase | Coverage for sealed unit failure and coating defects | Publish |
Details to ask in an enquiry
Collect only the information needed to assess the request and respond.
- Application and location in the building
- Determines safety and performance requirements.
- Glass build-up required
- Or the performance targets to design to.
- Pane sizes and quantities
- Drives feasibility and price.
- Thermal and solar targets
- Set by the energy calculation.
- Edgework, holes and cut-outs
- Determines processing capability needed.
- Delivery schedule and site access
- Glass delivery is a logistics operation in itself.
Related questions
How should performance values be published?
Per build-up, with the calculation basis and standard stated, because the values change with the whole unit rather than the glass alone. Facade consultants work from unit performance, and a manufacturer who publishes it per configuration is far easier to design in.
What do architects need earliest?
Maximum pane size, available build-ups and performance values. Facade concepts are set early, and the manufacturer whose constraints are known at that stage is the one the design is built around rather than value-engineered against later.
How should sealed unit warranties be presented?
With the period, what constitutes failure and what conditions apply, including installation requirements. Sealed unit failures appear years later and are the main source of dispute, so clarity in advance is worth more than a longer headline period.
This is an editorial checklist, not a compliance standard. Requirements vary by market, customer and contract. Confirm current requirements with the responsible technical and commercial teams.
Plact Research. Plact's editorial desk for buyer-evidence guides. The guides organize common buyer questions, documents and enquiry fields. Requirements should be checked against current standards, regulations and contracts.